Terms & Conditions
CROUCHERS Group Ltd – Terms & Conditions for all contract types to include Plumbing, Heating, Electrical, Bathroom & Kitchen Installation works.
1. AGREEMENT OF TERMS The acceptance of your estimate by booking a commencement of works date and/or payment of your initial deposit
(where applicable) identifies that you have read, understood and accept the contents of our terms and conditions of trading as follows:
ESTIMATES
a) The contents of all Estimates will remain valid for a period of 30 days from the date of issue. After this time we reserve the right to review,
amend and advise of any changes accordingly.
b) Works are carried out during our normal working hours of Monday to Friday between 08.00 – 16.30 unless stated and agreed otherwise.
c) Amendments to the contents of the estimate/tender may be necessary when certain elements of works are unforeseen and not visible during the
survey / design visit, and only become apparent once works have commenced. This situation is extremely rare, however, should this happen the
cost of any additional items/works will be discussed, agreed and settled prior to the recommencement of works. Should the payment of any
additional works require an alternative payment schedule other than those previously agreed will be at the discretion of the management team.
d) The basis of our tender is on a fixed price term unless an alternative arrangement has been expressed and agreed.
e) When a period of 6 months is reached from the acceptance of estimate, the re-costing of certain materials may be necessary to reflect the price
increase of our suppliers. Crouchers Group Ltd will always aim to absorb the fluctuating cost of materials where reasonably practicable to do so.
Customers will be made aware at the earliest opportunity, and prior to the work commencement date should this re alignment of cost be necessary.
In which you can decline and the job would be cancelled without any penalties.
f) The request of any additional works or variations to the original contents of the estimate, both prior to and once works have commenced, require
written confirmation (hand written or email) agreeing to the acceptance of any additional labour, material / product costs. Once works have
commenced, any changes made to products or items other than those identified in the estimate may be subject to a re-stocking charge, additional
carriage cost, or become non-refundable if they have fallen outside of the supplier’s return policy, the customer will be notified of any such charges.
Works cannot commence without written confirmation agreeing to the payment of any additional costs.
g) We accept no responsibility for any drawing, design or specifications not provided by us.
h) We accept no responsibility for any products not supplied by us. It is your responsibility for all products that you have supplied to be available
and on site in readiness for the installation commencement date. All products must be checked by yourselves for any damage & defects which may
prevent them from being fitted on the specified date. Should works be delayed as a result of products not being available to install for any reason
the labour cost of your installer will be charged at our standard daily rate. N.B Should this situation occur we will always aim to divert your installer
to a suitable alternative work schedule to prevent this additional cost.
i) Whilst the utmost care and respect is taken when working in your home, we do not include for the redecoration or other minor works that may
naturally occur as a result of the proper execution of works.
j) The laying of pipe work runs is by the shortest practicable route. Works required by other Trades (to include the statutory fees/charges by Supply
Authorities or Local Authority) are additional and are not included in our tender/estimate.
k) It is your responsibility to have knowledge of the location of the stopcock inside of your property and that it is fully accessible at the time of our
scheduled visit. Alternatively, we may be able to access the stopcock located in the road if you identify in advance that access internally may not be
possible.
l) Whilst the utmost care and skill is taken when executing updates or additions to your existing Hot Water/Plumbing/ Electrical systems, at times
and through no fault of our own, this can cause the existing systems to fail resulting in additional unforeseen updates/ replacements to align them
with the new system. Any additional works, and the cost of, will be identified, discussed and agreed to prior to works being carried out. Once the
agreement in writing (written or via email) of any additional works/cost is in place works will commence.
2. COMPLETION
a) We will endeavour to carry out works within the specified timescale, or if not stipulated, within a reasonable time. We do not accept responsibility
for consequential loss or damage arising from delays outside of our control.
3. TERMS OF PAYMENTS
a) Payment is required for all types of contracted works either within 7 days of invoicing and/ or completion of for all types of works.
b) For Plumbing/Heating and Electrical works with a contract duration of less than 4 weeks – payment in full is required upon satisfactory
completion. (Materials may be invoiced prior to installation where specified in Tender)
c) For Plumbing/Heating and Electrical works with a contract duration of more than 4 weeks written applications/invoices may be submitted monthly
in arrears for the total value of work executed (less any previous payments received). Payments should be paid on demand in this instance.
d) For Bathroom & Kitchen Installation works an initial deposit of 25% is required to secure a commencement of works date. A further 25%
payment will be due the day works commence and the remaining 50% payment will be due upon satisfactory completion of works (in
accordance with section A).
e) ALL materials remain the property of Crouchers Group Ltd until all payments have been received – this is applicable to ALL contract types.
f) If monies are not received within the agreed payment terms without lawful justification, we reserve the right to claim any
reasonable and foreseeable losses we incur as a result.
We reserve the right to take the appropriate action to recover monies owed.’
4. LEGAL RIGHTS
We will pass on to the customer the benefit of any guarantees provided to us for materials we have supplied.
Please note this is in addition to your legal rights as a consumer, under the Consumer Rights Act 2015, and does not affect these rights.
It is our responsibility to supply you with goods that meet your consumer rights. If you have any concerns that we have not met our legal
obligations, please contact us.
If you would like advice about your legal rights, you can contact the Citizens Advice Consumer Service on 0808 223 1133.
5. COMPLAINTS PROCEDURE
a) If you have any concerns regarding the conduct of any staff member, you may raise them in complete confidence directly with the Company
Manager, Mr. Martin Barber.
Contact him by calling 01243 545400 and requesting to be transferred to his direct line, or by emailing martin.barber1@timcroucherplumbing.co.uk.
b) Customers should report any concerns, issues, or snagging items as soon as possible following completion of the works. Where possible, please
include photographic evidence via email. To arrange an assessment of any remedial work, a site visit can be requested through the Company
Manager, Mr. Martin Barber.
c) If your concerns are not resolved to your satisfaction after following the above steps, you may request a meeting with a Company Director of
Croucher Group Ltd. This can be arranged through the Bathroom Manager, Mr. D. Tayman, by calling 01243 545400.
